On this page

Background

Dragontrail cover glass supplied by AGC Inc. is expected to be discontinued starting in Q3 this year, with LTB 2026 Q2.

This material is currently used as the cover glass for touch panel assemblies in several programs. To ensure supply continuity and minimize disruption, a mitigation and transition plan has been initiated.

 

Key Timeline

Milestone Estimated Timing
Supplier discontinuation announcement Q3
Last Time Buy (LTB) window Q2 (Apr–May)
Safety stock preparation Q2
Alternative material validation Q2–Q3
Potential transition window TBD after validation

 

Supply Risk Mitigation Strategy

Safety Stock Preparation

To protect ongoing and future production programs, we plan to secure safety stock of Dragontrail glass depends on project demand.

Benefits include:

  • Avoiding short-term supply interruptions
  • Preventing unnecessary design changes during active product cycles
  • Minimizing the risk of immediate PCN (Product Change Notification) after product launch

Customer support is requested to provide:

  • EAU (Estimated Annual Usage)
  • Product lifecycle forecast (next 2–3 years)

This information will allow accurate material planning for the LTB order.

 

Alternative Glass Solutions

To reduce long-term supply risk, alternative chemically strengthened glass materials are being evaluated:

  • Aluminosilicate glass

Both Gorilla Glass and Panda Glass are mature industry solutions with strong mechanical performance.

  • Low-Iron Soda-Lime Glass with High Optical Transmittance

Low-iron soda-lime glass is a type of float glass with significantly reduced iron content compared to standard soda-lime glass. By lowering Fe₂O₃ concentration, the characteristic green tint in conventional glass is minimized, resulting in improved transparency and higher optical transmittance.

With light transmittance typically exceeding 91%, low-iron soda-lime glass is widely used in applications where visual performance is critical, including: Display cover lenses, Touch panels, Photovoltaic panels, Architectural glazing, Optical components.

In addition to superior transparency, low-iron soda-lime glass provides with good chemical stability, excellent surface flatness, and compatibility with common surface treatments such as anti-reflective (AR), anti-glare (AG), and anti-fingerprint (AF) coatings.

These characteristics make it an ideal material for modern electronic displays and optical systems, balancing clarity, reliability, and cost efficiency.

 

Item Dragontrail Gorilla Glass Panda Glass Low-Iron Soda-Lime

Glass

Supplier AGC Inc. Corning Chinese glass manufacturer AGC, NSG, Guardian, Saint-Gobain, Chinese suppliers(CSG, Kibing, Xinyi)
Base Material Aluminosilicate Aluminosilicate Aluminosilicate Low-iron soda-lime-silica glass
Strengthening process Ion-exchange Ion-exchange Ion-exchange Thermal tempering or chemical strengthening
Surface hardness ~7H–9H ~7H–9H ~7H–8H ~6H – 7H
Light transmittance ~91–92% ~91–92% ~90–91% ~90–92%
Surface Compression Stress (CS) ~800–900 MPa ~800–900 MPa ~700–850 MPa  

~400–700 MPa

Depth of Layer (DOL) ~35–50 μm ~40–60 μm ~30–50 μm ~10–40 µm
Dielectric properties Baseline Similar Slightly different – RF verification recommended Similar
Cost level Medium Higher Lower Lower
Supply availability Discontinuing Q3 Stable global supply Stable regional supply Multiple global suppliers

 

 

Reliability Test Requirements and Technical Considerations

The product may need to pass some durability and reliability tests (acceptance criteria: no glass breakage). Following are some test examples depends on different application:

  • Terminal Drop Test – eg: 1.0 m drop, granite surface, 6 sides + 4 corners
  • Mohs Hardness Test – eg: >6H (preferred up to 9H)
  • Steel Ball Impact Test – eg: 173 g ball, minimum 4 inch drop height
  • Continuous Vertical Force Test – eg: 40 lbs force, 30 seconds
  • Coating Verification(AF/AR/AG etc.)

Some tests require system-level validation with the finished device.

  • Finished product drop testing
  • Mechanical integration verification
  • RF / wireless signal performance testing

Because different glass materials have slightly different dielectric properties, wireless communication performance shall be considered.

 

Next Steps

  • Secure Dragontrail LTB inventory
  • Continue alternative material validation
  • Coordinate system-level testing if material transition is required

Our goal is to ensure stable supply, maintained product reliability, and minimal disruption to customer programs.

If you have any questions, please contact our engineering.

Frequently asked questions

Why is there a Dragontrail cover glass transition plan?

Dragontrail cover glass supplied by AGC Inc. is expected to be discontinued. It is used as the cover glass for touch panel assemblies in several programs, so a mitigation and transition plan has been initiated to ensure supply continuity and minimize disruption.

What are the steps in the Dragontrail transition plan?

The plan runs in order: a last time buy (LTB) window, safety stock preparation, alternative material validation, and a potential transition window that will be set after validation. All timing is estimated, so contact Orient Display engineering for current dates.

What glass alternatives are being evaluated?

Two groups are being evaluated. The first is aluminosilicate glass: Gorilla Glass and Panda Glass, both mature industry solutions with strong mechanical performance. The second is low-iron soda-lime glass, which has less iron, so less green tint and higher transmittance, and works with AR, AG and AF coatings.

What tests may a cover glass transition require?

Durability tests with a no-glass-breakage criterion, such as a terminal drop test, a hardness test, a steel ball impact test, a continuous vertical force test and coating verification. System-level checks cover finished product drops, mechanical integration and RF or wireless performance, because glass materials differ slightly in dielectric properties.

Why does the plan call for safety stock?

Safety stock of Dragontrail glass, sized to project demand, helps avoid short-term supply interruptions and unnecessary design changes during active product cycles. It also reduces the risk of an immediate Product Change Notification (PCN) after product launch. Planning the LTB order needs Estimated Annual Usage (EAU) and a 2–3 year product lifecycle forecast.

From the knowledge base

Using Dragontrail cover glass in your program?

Send your annual usage and lifecycle forecast so we can plan the last-time buy and validate an alternative.